Home Major A99 Motorway Closure in Munich: Nov 20-23, 2026

Major A99 Motorway Closure in Munich: Nov 20-23, 2026

Share
Share

Editorial Note: This article was rewritten using Artificial Intelligence (AI) based on original, verified sources. The accompanying images were upscaled with the assistance of AI. Any resemblance of figures in the images to real persons is entirely coincidental. Brands and logos depicted are the property of their respective owners and do not imply official endorsement or affiliation.

Drivers in the Munich area should prepare for significant traffic disruptions as the A99 eastern bypass will be completely closed for an entire weekend. The closure is necessary to facilitate the demolition of the aging B304 bridge at the Haar junction.

Closure Details

The A99 will be inaccessible in both directions between the Munich-East (München-Ost) and Munich-South (München-Süd) motorway junctions.

  • Start: Friday, November 20, 2026, at 8:00 PM
  • End: Monday, November 23, 2026, at 5:00 AM

During this period, only the Hohenbrunn and Ottobrunn junctions (direction Salzburg) and the Haar junction (direction Nuremberg/Stuttgart) will remain open between the two main motorway junctions.

Recommended Actions for Drivers

The motorway operator, Autobahn GmbH, strongly advises avoiding unnecessary travel in the greater Munich area during this weekend. Due to the high volume of traffic typically using this route (approximately 96,000 vehicles per day), significant congestion is expected on all surrounding roads.

Tips to avoid major delays:

  • Avoid the area: If possible, postpone non-essential trips.
  • Use public transport: Consider using trains or other public transport options to bypass the road network.
  • Plan extra time: If you must drive, allow for significant additional travel time.
  • Use wide-area detours: Avoid small residential streets and local shortcuts, which are likely to become quickly overwhelmed. Long-distance traffic is encouraged to use the A3 towards Regensburg/Passau or the A94 as alternative routes.

Background on the Construction

The B304 bridge, built in 1973, has reached the end of its service life and shows significant structural damage. While it remains safe for current traffic, it is no longer suitable for heavy transport. A temporary bridge has been constructed south of the existing structure to maintain traffic flow on the B304 during the construction period, which is scheduled to last until December 2028.

Source: BR24

Share
Related Articles

Pros and Cons of Living in Germany

Editorial Note: The content of this article and the accompanying images were...

Why Tourism Brands Can’t Ignore AI Search in 2027

Tourism brands can’t afford to ignore AI search in 2027 because it...

Germany’s Evolving EU Leadership Role

Germany clearly holds a leading role in the European Union. This position...

Krampus Tradition in Germany: History and Modern Celebrations

The Krampus tradition in Germany is an old and striking custom, closely...

whysogermany.com
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.