Editorial Note: This article was rewritten using Artificial Intelligence (AI) based on original, verified sources. The accompanying images were upscaled with the assistance of AI. Any resemblance of figures in the images to real persons is entirely coincidental. Brands and logos depicted are the property of their respective owners and do not imply official endorsement or affiliation.
The Ernst-Reuter-Sportfeld in Berlin-Zehlendorf is poised for significant development, solidifying its position as a key location for German competitive hockey. Following a federal decision, the sports facility will take on a new role, complemented by a planned construction project to modernize its infrastructure.
Federal Recognition as a Hockey Training Center
Starting January 1, 2027, the ‘Reuter 2’ artificial turf pitch at the Ernst-Reuter-Sportfeld will officially be recognized as a training site for the federal hockey training center (Bundesstützpunkt) in Berlin. The Federal Office of Administration approved this designation in a letter dated November 11, 2026. This recognition opens new avenues for the Berliner Hockey-Club (BHC), which utilizes the facility, potentially allowing for federal funding for maintenance and infrastructure investments.
The site’s suitability for high-level sports was reinforced in June 2026, when the pitch received ‘FIH Category 2’ certification from the International Hockey Federation. Recent improvements, including upgraded LED lighting and irrigation systems, have further enhanced the facility’s capabilities.
New Functional Building Planned for 2027
In addition to its new training status, the facility will undergo a major construction project. The existing changing room building, dating back to the 1950s, is no longer adequate for modern sports requirements. A replacement building is planned, with work expected to begin in the first quarter of 2027 and completion targeted for the spring of 2028.
The project is supported by federal funding, with 863,550 euros allocated from the ‘Renovation of Municipal Sports Facilities’ program. The total investment volume is estimated to exceed two million euros. The new two-story structure will feature:
- Eight team changing rooms
- Two additional rooms for tennis and referees
- Storage areas and a multi-purpose room
- Publicly accessible toilets
The new building will also incorporate sustainable technologies, including heat pumps and a photovoltaic system, managed by an intelligent energy system to optimize consumption.
International Hockey in Berlin
The Ernst-Reuter-Sportfeld will continue to be a venue for international competition. Berlin is designated to host matches of the FIH Pro League from June 12 to 16, 2027, with 16 games scheduled for the capital.
Source: Entwicklungsstadt Berlin